pessimistic duration oor Portugees

pessimistic duration

en
The worst-case possibility for the total span of active working time expected for a task, that is, the amount of time from the pessimistic start to pessimistic finish of a task.

Vertalings in die woordeboek Engels - Portugees

duração pessimista

en
The worst-case possibility for the total span of active working time expected for a task, that is, the amount of time from the pessimistic start to pessimistic finish of a task.
PERT pessimistic duration: %
Duração pessimista do PERT: %
MicrosoftLanguagePortal

Geskatte vertalings

Vertoon algoritmies gegenereerde vertalings

voorbeelde

wedstryd
woorde
Advanced filtering
Voorbeelde moet herlaai word.
Pessimistic duration: %
Então suponho que tenha o localKDE40.1 KDE40.1
The pessimistic duration
Encontramos um lugar aqui que serve exatamente o que você precisaKDE40.1 KDE40.1
PERT pessimistic duration: %
Você o conhece?KDE40.1 KDE40.1
Pessimistic Duration (task field) - Project
Uma combinação complexa de estímulos visual e subsônico aural... engenhosamente criada para amplificar os impulsos elétricos do cérebroParaCrawl Corpus ParaCrawl Corpus
To view the optimistic, expected, and pessimistic durations, on the PERT Analysis toolbar, click Optimistic Gantt, Expected Gantt, or Pessimistic Gantt .
Tendo em conta o livro verde intitulado Iniciativa Europeia em matéria de Transparência, aprovado pela Comissão em # de Maio de # [COM #]ParaCrawl Corpus ParaCrawl Corpus
In this podcast, Ricardo introduces the main concepts of PERT Analysis, mechanism of calculation that uses the optimist, most probable and pessimistic duration in order to determine the expected duration of the task, allowing that the statistical concepts of standard deviation and variance be determined and then, the numerical probability of project duration accomplishment be calculated.
É difícil dizer isso, então vou dizer de uma vezParaCrawl Corpus ParaCrawl Corpus
After you specify the optimistic, pessimistic, and expected durations of the tasks in your schedule, Microsoft Office Project 2007 calculates a weighted average of the three durations.
Morfeu está lutando com o NeoParaCrawl Corpus ParaCrawl Corpus
When you enter pessimistic start and finish dates, and then click Calculate PERT on the PERT Analysis toolbar, a probable worst-case duration is calculated and placed in the Duration field.
Inclui os pagamentos feitos por sucursais, filiais e associadas à empresa-mãe e outras empresas relacionadas que representem contribuições para os custos de gestão geral das filiais, subsidiárias e associadas (de planificação, organização e controlo) e também reembolsos de despesas pagas directamente pela empresa-mãeParaCrawl Corpus ParaCrawl Corpus
8 sinne gevind in 10 ms. Hulle kom uit baie bronne en word nie nagegaan nie.