The sludge growth/stabilization period is the period during which the concentration of the activated sludge suspended solids and the performance of the units progress to a steady state under the operating conditions usedOpenSubtitles2018.v3 OpenSubtitles2018.v3
Weeks away and hundreds of miles up a river... that snaked through the war like a main circuit cable... plugged straight into KurtzLiterature Literature
The evaluation of this request has revealed that the conditions for authorising these grading methods are fulfilled for the HGP # apparatus, but only partially for the ZP-DM# apparatusLiterature Literature
Él, si lo hubieseis conocido, él... era un buen niño.
Therefore, it is impossible to draw an overall conclusion from the capacity of individual machines concerning the production capacityLiterature Literature