Besonderhede van voorbeeld: -4581194414262048521

Metadata

Data

English[en]
This section includes an approximately 30-mile segment between Hwy 9 and I-10, which would enable potential access to the rich renewable resource areas of southern New Mexico, and a 5-mile loop between the existing Afton Substation and the existing Luna-Diablo 345-kV transmission line (a technical requirement of the project which serves to strengthen the existing system). The Upgrade Section would consist of double-circuit 230-kV lines connecting the Apache Substation to the existing Saguaro Substation northwest of Tucson, Arizona. The Upgrade Section would rebuild approximately 120 miles of existing single-circuit 115-kV transmission lines, currently owned by the Western Area Power Administration (Western), providing up to 1,000 MW of transmission capacity between these substations.
Spanish[es]
Esta sección incluye un segmento de aproximadamente 30 millas entre las autopistas Hwy 9 e I-10, lo que permitiría el acceso potencial a las zonas ricas en recursos renovables al sur de Nuevo México, y un circuito de 5 millas entre la Subestación existente de Afton y la actual línea de transmisión de 345-kV de Luna-Diablo, un requerimiento técnico del proyecto que sirve para sección actualizada, reconstruiría aproximadamente 120 millas de líneas de transmisión existentes de 115 kV, actualmente propiedad de Western Área Power Administration (WAPA), proporcionando así hasta 1,000 MW de capacidad de transmisión entre estas subestaciones.

History

Your action: