Metadata
Author: WikiMatrix
Data
English[en]
In the minutes before the event, the NYISO-managed power system was carrying 28,700 MW of load.
Spanish[es]
En los minutos previos al evento, el sistema de energía administrado por NYISO llevaba una carga de 28,700 MW.