Besonderhede van voorbeeld: 5049134093562452568

Metadata

Author: Giga-fren

Data

English[en]
the Grantor will not carry out blasting or aerial logging operations on or adjacent to the Area of the Works without prior written permission from Delta Cable, which permission will not be unreasonably withheld, delayed or accompanied by unreasonable conditions; and the Grantor will not diminish or increase the ground elevation in the Right-of-Way Area by any method, including piling any material or creating any excavation, drain or ditch in the Right-of-Way Area, unless permission in writing from Delta Cable has first been received, which permission will not be unreasonably withheld, delayed or accompanied by unreasonable conditions.
French[fr]
le cédant ne procédera pas à des opérations de dynamitage ou de débardage aérien dans le secteur des ouvrages, ni près de celui-ci, sans avoir au préalable obtenu l’autorisation écrite de Delta Cable, laquelle autorisation ne peut être refusée ou retardée sans raisons valables ni assortie de conditions déraisonnables; le cédant ne modifiera d’aucune façon l’élévation du sol dans la zone d’emprise, notamment en entassant des matériaux ou en créant des déblais, des drains ou des fossés dans cette zone, sans avoir au préalable obtenu l’autorisation écrite de Delta Cable, laquelle autorisation ne peut être refusée ou retardée sans raisons valables ni assortie de conditions déraisonnables.

History

Your action: