Besonderhede van voorbeeld: 5372551769655030365

Metadata

Data

English[en]
When the closing parts of the steel structure were placed at both sides of the Central Pier, and with the top precast slab placed at their final and definitive position, the top slab concreting over the pierhead finished the execution of the Central Pier (Figure 20).
Spanish[es]
Una vez colocados los tramos de cierre de la estructura metálica a ambos lados de la Pila Central, y montadas las prelosas superiores, se ejecutó in situ la losa superior sobre la cabeza de la pila (Figura 20).

History

Your action: