Besonderhede van voorbeeld: 5667692347481835005

Metadata

Author: patents-wipo

Data

English[en]
Step A, according to the distribution of the soil layers in the field of the soft soil foundation to be treated, vacuum well point pipes arrayed in different separation distances are inserted into the different soil layers, and at the same time plastic drainage boards are inserted into the soft soil foundation in order to accelerate the drainage from the soil and accelerate the dissipation of the excess pore water pressure. Step B, vacuumize the well point pipes for several days, and then remove all or part of the well point pipes, and tamp the soil with proper energy. Step C, insert the well point pipes back, and repeat step B until the design requirement is met.
French[fr]
Opération A : selon la répartition des couches dans le sol ou doivent 'être réalisées des fondations, mise en place d'un ensemble de conduits pour puits à différentes distances les uns des autres et, simultanément, introduction de planches de drainage en plastique dans le sol meuble afin d'accélérer le drainage du sol et la dissipation de la pression interstitielle de l'eau ; opération B : mise sous vide des tuyaux de puits pendant plusieurs jours, puis retrait en totalité ou en partie de ces tuyaux, et battage du sol au niveau d'énergie approprié ; opération C : réinsertion des tuyaux de puits et reprise de l'opération B jusqu'à ce que les exigences du cahier des charges soient satisfaites.

History

Your action: