Besonderhede van voorbeeld: 8243448693169848016

Metadata

Author: WikiMatrix

Data

English[en]
The fifth AREVA-Siemens-built reactor – the world's largest at 1600 MWe and a focal point of Europe's nuclear industry – has faced many delays and is currently scheduled to be operational by 2018–2020, a decade after the original planned opening.
Latin[la]
Quintum a societatibus AREVA et Siemens constructum reactorium —maximum in toto orbe terrarum cum 1600 MW et fons nuclearis industriae in Europā— complures moras oppetivit et in praesenti tempus statuit ut sit operatorium inter annos 2018 ac 2020, decennium post originalem destinatam apertionem.

History

Your action: