Metadata
Author: WikiMatrix
Data
English[en]
The line was constructed using various methods; the incline rising through a deep tunnel, the portion on the flat at Croix-Rousse using cut-and-cover while the section beyond Hénon runs on the surface.
Indonesian[id]
Jalur ini dibangun menggunakan metode yang berbeda-beda; pendakian melalui terowongan, bagian rel di Croix-Rousse menggunakan potong-dan-timbun, sementara bagian di belakang Hénon berjalan di permukaan tanah.