budgeted cost of work performed oor Nederlands

budgeted cost of work performed

en
The earned value field that indicates how much of the task's budget should have been spent, given the actual duration of the task.

Vertalings in die woordeboek Engels - Nederlands

gebudgetteerde kosten van uitgevoerd werk

en
The earned value field that indicates how much of the task's budget should have been spent, given the actual duration of the task.
MicrosoftLanguagePortal

Geskatte vertalings

Vertoon algoritmies gegenereerde vertalings

voorbeelde

wedstryd
woorde
Advanced filtering
Voorbeelde moet herlaai word.
schedule performance index based on comparing budgeted cost of work performed with budgeted cost of work scheduled.
De Commissie heeft daarom op dit moment geen reden om aan te nemen dat de richtlijn betreffende de milieu-effectbeoordelingen de Habitatrichtlijn niet correct worden toegepastEurLex-2 EurLex-2
schedule performance index per major item of the programme based on comparing budgeted cost of work performed with budgeted cost of work scheduled;
Het floepte er gewoon uitEurLex-2 EurLex-2
Earned value (EV): The approved budget for the work actually completed by the specified date; also referred to as the budgeted cost of work performed (BCWP).
Alsof dat jou een zorg zal zijn!Eurlex2019 Eurlex2019
How Calculated CV% is the percentage of the cost variance (CV) divided by BCWP (budgeted cost of work performed).
Indien de bedienden, krachtens de bepalingen van hun arbeidsovereenkomst, slechts gedurende een gedeelte van de refertemaand moeten werken en zij al die tijd niet hebben gewerkt, wordt hun brutoloon berekend op grond van het aantal arbeidsdagen, dat in de arbeidsovereenkomst is vastgesteldParaCrawl Corpus ParaCrawl Corpus
Example The schedule variance for a task (the difference between budgeted cost of work performed and scheduled) is $50.
Het was net een emotionele prikstokParaCrawl Corpus ParaCrawl Corpus
How Calculated CV% is the percentage of the task's timephased cost variance (CV) divided by timephased BCWP (budgeted cost of work performed).
De rest nog bevroren?ParaCrawl Corpus ParaCrawl Corpus
How Calculated CV% is the percentage of the task's timephased cost variance (CV) divided by timephased BCWP (budgeted cost of work performed).
We rukken op zodra ' t spervuur begintParaCrawl Corpus ParaCrawl Corpus
How Calculated CV is the difference between the resource's BCWP (budgeted cost of work performed) and ACWP (actual cost of work performed).
Vrede door leugensParaCrawl Corpus ParaCrawl Corpus
How Calculated CV is the difference between the task's BCWP (budgeted cost of work performed) and ACWP (actual cost of work performed).
° van de vorderingen van het openbaar ministerie betreffende minderjarigen wier gezondheid, veiligheid of zedelijkheid gevaar loopt hetzij wegens het milieu waarin zij leven hetzij wegens hun bezigheden, of wanneer de omstandigheden waarin zij worden opgevoed, gevaar opleveren door het gedrag van degenen die hen onder hun bewaring hebbenParaCrawl Corpus ParaCrawl Corpus
How Calculated CV% is the percentage of the task's timephased cost variance (CV) divided by timephased BCWP (budgeted cost of work performed).
Gegroet, zieke fanParaCrawl Corpus ParaCrawl Corpus
Sign in Apps percent) fields show the ratio of cost variance (CV) to budgeted cost of work performed (BCWP), expressed as a percentage.
Nou, wat doe je dan op een schietbaan?ParaCrawl Corpus ParaCrawl Corpus
Best Uses Use the ACWP field in conjunction with the BCWP (budgeted cost of work performed) field to compare actual to budgeted assignment costs.
Daarnaast is het van essentieel belang rekening te houden met de komende uitbreiding van de Europese Unie en extra begrotingsmiddelen uit te trekken voor de bijenteelt.ParaCrawl Corpus ParaCrawl Corpus
How Calculated CV is the difference between the task's timephased BCWP (budgeted cost of work performed) and timephased ACWP (actual cost of work performed).
Dat is dapper, daar hou ik vanParaCrawl Corpus ParaCrawl Corpus
How Calculated CV is the difference between the resource's timephased BCWP (budgeted cost of work performed) and timephased ACWP (actual cost of work performed).
Toen realiseerde ik me, dat ze iets probeerden te verbergenParaCrawl Corpus ParaCrawl Corpus
How Calculated CV is the difference between the assignment's timephased BCWP (budgeted cost of work performed) and timephased ACWP (actual cost of work performed).
Je hebt het gezworenParaCrawl Corpus ParaCrawl Corpus
The CV% (cost variance percent) field shows the ratio of cost variance (CV) to budgeted cost of work performed (BCWP), expressed as a percentage.
Hou je goed, playboyParaCrawl Corpus ParaCrawl Corpus
Budgeted cost of work performed (BCWP) is EV, because it measures the cost you estimated for the work completed, or earned, through the status date.
Tot besluit, wil ik jullie allemaal heel erg bedanken dat jullie zijn gekomenParaCrawl Corpus ParaCrawl Corpus
The Earned Value Method field provides choices for whether the % Complete or Physical % Complete field should be used to calculate budgeted cost of work performed (BCWP).
Zuigelingen van # tot # maanden: twee doses, elk van # ml met een interval van ten minste # maand tussen de dosesParaCrawl Corpus ParaCrawl Corpus
The Physical % Complete field shows an entered percent complete value that can be be used as an alternative for calculating budgeted cost of work performed (BCWP).
CPA #.#.#: Brandstof-, olie- en koelvloeistofpompen, betonpompenParaCrawl Corpus ParaCrawl Corpus
SPI (task field) The SPI (schedule performance index) field shows the ratio of the budgeted cost of work performed to the budgeted cost of work scheduled (BCWP/BCWS).
Ze was vast al doodgeschoten voordat de napalm vielParaCrawl Corpus ParaCrawl Corpus
Description The Earned Value Method field provides choices for whether the % Complete or Physical % Complete field is to be used to calculate budgeted cost of work performed (BCWP).
Bel me even als je kuntParaCrawl Corpus ParaCrawl Corpus
Entry Type Entered Description The Physical % Complete field shows an entered percent complete value that can be be used as an alternative for calculating budgeted cost of work performed (BCWP).
Was ik de enige onderaannemer die van jou moest beknibbelen?ParaCrawl Corpus ParaCrawl Corpus
Use this report to view a chart that plots AC (actual cost of work performed), planned value (budgeted cost of work scheduled), and earned value (budgeted cost of work performed) over time.
Devastlegging in de begroting is de handeling waarbij de kredieten worden gereserveerd die nodig zijn voor de latere betalingen ter uitvoering van een juridische verbintenisParaCrawl Corpus ParaCrawl Corpus