project (self-)evaluation report oor Spaans

project (self-)evaluation report

Vertalings in die woordeboek Engels - Spaans

informe de (auto)evaluación de proyectos

UN term

Geskatte vertalings

Vertoon algoritmies gegenereerde vertalings

Soortgelyke frases

Project Performance Evaluation Report
IEEP · informe sobre la evaluación de la ejecución de proyectos

voorbeelde

wedstryd
woorde
Advanced filtering
Voorbeelde moet herlaai word.
Meta-analysis of a purposive sample of 20 out of 85 UNODC project evaluation reports from 2008-2012;
En Sand Creek pasado mañanaUN-2 UN-2
· Project evaluation reports
No es mucho en lo que basarse, le concedo eso, pero... es un principioUN-2 UN-2
Project evaluation reports
Entonces él fue al molino|con el dineroUN-2 UN-2
The project evaluation report for # shows the following statistics
VicepresidenteMultiUn MultiUn
iv) Programme and project evaluation reports
Lo siento por estoMultiUn MultiUn
Programme evaluations are submitted to the Joint Advisory Group; project evaluation reports are shared with all partners involved.
Sé que esto no puede ser fácil para tiUN-2 UN-2
Project completion and post-project evaluation reports are expected to assess any project’s impact on women.
Salió el solUN-2 UN-2
Project completion and post-project evaluation reports are expected to assess any project's impact on women
Porque yo he sido succionado en el drama de ellos antesMultiUn MultiUn
Programme and project evaluation reports (4).
Empieza cuando Freddy abre la puertaUN-2 UN-2
Results of the pilot and demonstration project evaluation reports noting improved services/programmes;
Lo que implica que pensábamos en Dios una hora una vez por semanaUN-2 UN-2
Results of the pilot project evaluation reports noting improved services/projects.
Proyectos de interés comúnUN-2 UN-2
Programme and project evaluation reports
La Directiva #/#/CE queda modificada de la siguiente maneraUN-2 UN-2
At a 2013 conference, the project evaluation report was provided to Georgian members of parliament, academics and other interested parties.
Pide a los Estados miembros que hagan frente con eficacia a cualquier forma de violencia contra las mujeres inmigrantes prestando la suficiente asistencia médica, jurídica y social a las víctimas de la violencia, aplicando programas de reintegración social de las víctimas, posibilitando el acceso a casas de acogida a las víctimas de la trata de personas-cuyasnecesidades de seguridad y protección han de tenerse debidamente en cuenta-, así como informando a las mujeres inmigrantes deforma preventiva sobre sus derechos en el país de acogidacordis cordis
An OIOS meta-analysis of UNEP project evaluation reports revealed that all had capacity-building in their design and implementation.
¿ Por qué?Porque no confiamos en los extrañosUN-2 UN-2
Finally, the creation of additional permanent jobs could not be verified because this matter was not addressed in the drafting of the project evaluation reports.
Al final del período cubierto por el informe se alcanzó finalmente una solución de trabajo con el Director General de la OLAF, otorgándose al Comité el pleno acceso a los casos que éste solicite examinarEurLex-2 EurLex-2
The Commission ’ s actions were monitored, reported and evaluated via project reporting, field visits, ROM reports, evaluations and audits.
Chihiro, graciaselitreca-2022 elitreca-2022
The Board noted that UNOPS had used project performance evaluation reports for only # of the # projects reviewed
OrtodonciaMultiUn MultiUn
Another project's evaluation report noted positive outputs, although the training and equipment components envisaged in the project document and not implemented due to funding constraints were covered through other channels
Preparar los portaobjetos según uno de los procedimientos siguientesMultiUn MultiUn
Another project’s evaluation report noted positive outputs, although the training and equipment components envisaged in the project document and not implemented due to funding constraints were covered through other channels.
Entre el adiestrador y la serpiente de dos cabezasUN-2 UN-2
The programme-specific reviews were conducted between May and July # and drew upon project evaluations, reports on the Government-led sector-wide approaches, where relevant, national surveys, and other related research
A casa, antes que ChrisMultiUn MultiUn
UNOPS only conducts project performance evaluation reports and tripartite reviews when this is required by the project document
Keeler es demasiado inteligente para jugar la carta racial o la de la noviaMultiUn MultiUn
UNOPS only conducts project performance evaluation reports and tripartite reviews when this is required by the project document.
No sé cómo decirloUN-2 UN-2
The Board noted that UNOPS had used project performance evaluation reports for only 4 of the 11 projects reviewed.
Que pinten cuadros más bonitos?UN-2 UN-2
The programme-specific reviews were conducted between May and July 2008, and drew upon project evaluations, reports on the Government-led sector-wide approaches, where relevant, national surveys, and other related research.
Las cosas se pueden poner un poco formales por aquíUN-2 UN-2
Copies of projects and programme reports are forwarded by the evaluating party(ies) to the Executive Director; if UNDP Evaluation Office performs/participates in project evaluation, reports are submitted to Executive Director.
¿ Sabes qué se puede hacer para cambiarla?UN-2 UN-2
3284 sinne gevind in 54 ms. Hulle kom uit baie bronne en word nie nagegaan nie.