ro-ro berth oor Spaans

ro-ro berth

Vertalings in die woordeboek Engels - Spaans

puesto de atraque de transbordo rodado

UN term

Geskatte vertalings

Vertoon algoritmies gegenereerde vertalings

voorbeelde

wedstryd
woorde
Advanced filtering
Voorbeelde moet herlaai word.
Dublin port: north quay ro-ro berth (Stage I)
Vamos a dormir como todo el mundo, comenzaremos la busqueda en la mañanaEurLex-2 EurLex-2
Whereas on 28 July 1993 Ireland submitted an application for assistance from the cohesion financial instrument for the project Dublin port: north quay ro-ro berth (Stage I));
Las medidas previstas en la presente Decisión se ajustan al dictamen del Comité del espectro radioeléctricoEurLex-2 EurLex-2
The stage of project Dublin port: north quay ro-ro berth (Stage I) situated in Ireland as described in Annex I hereto is hereby approved for the period from 1 January 1993 to 31 December 1994.
Espera aquíEurLex-2 EurLex-2
| Port works (quays, ro-ro berths, buildings, pavements, barriers, network systems) to allow the commercial port to become a logistically and economically valid alternative port for traffic crossing the Messina Strait and attract container and bulk cargo traffic.
El gato silvestre lloró un millón de veces, y después murióEurLex-2 EurLex-2
Port works ( quays, ro-ro berths, buildings, pavements, barriers, network systems ) to allow the commercial port to become a logistically and economically valid alternative port for traffic crossing the Messina Strait and attract container and bulk cargo traffic.
Te transformastes en un tontoelitreca-2022 elitreca-2022
94/593/EC: Commission Decision of 13 April 1994 concerning the grant of assistance from the cohesion financial instrument to the following stage of project in Ireland: Dublin port: north quay ro-ro berth (Stage I) (Only the English text is authentic)
Es mi trabajo, queridaEurLex-2 EurLex-2
COMMISSION DECISION of 13 April 1994 concerning the grant of assistance from the cohesion financial instrument to the following stage of project in Ireland: Dublin port: north quay ro-ro berth (Stage I) No CF: 93/07/65/017 (Only the English text is authentic) (94/593/EC)
Se ha observado neuropatía en el # % de los pacientes tratadosEurLex-2 EurLex-2
Extension to the Ro-Ro Ferry Terminal berth in the Port of Setubal — 1st phase — Studies and Projects
Que no nos gusta, lo dejamos y en pazEurLex-2 EurLex-2
Projects: The agricultural terminal, multi-purpose terminal, new Logistics centre, ro-ro berth
¡ Todo es falso!ParaCrawl Corpus ParaCrawl Corpus
Ro-ro berth N° 3, which is located at the foot of the Pont de Saint-Nazaire Bridge, received its very first vessels in February 2016.
La declaración de tu tarjeta de créditoParaCrawl Corpus ParaCrawl Corpus
The €863m ($970m) project, dubbed Calais Port 2015, will double capacity at the port by the time new ferry and ro-ro berths come into operation in 2021.
Te admiraba.Y daba gracias a DiosParaCrawl Corpus ParaCrawl Corpus
Ro-Ro: Vessels berth at Berth No. 5/2.
Es un imbécil, probablemente desde el nacimientoParaCrawl Corpus ParaCrawl Corpus
All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth.
Régimen retributivo de los miembros del Tribunal de Cuentas y, en particular, sus artículos # yEurLex-2 EurLex-2
.1 All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth.
¿ A dónde me estás llevando?EurLex-2 EurLex-2
.1All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth.
Adivina qué encontré en la habitación de BillyEurlex2019 Eurlex2019
1 All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth..
¿ Dónde está papá?EurLex-2 EurLex-2
All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth
Tengo cuello, tengo tetillasoj4 oj4
All transverse and longitudinal bulkheads which are taken into account as effective to confine the seawater accumulated on the ro-ro deck shall be in place and secured before the ship leaves the berth and remain in place and secured until the ship is at its next berth.
Lo que no saben es que poco después de que Dowdy entrara con su regimiento en Al Kut, el general Mattis lo relevó del mandoEuroParl2021 EuroParl2021
35 sinne gevind in 10 ms. Hulle kom uit baie bronne en word nie nagegaan nie.