The cement stored in the silos is discharged onto 1 km conveyor belt, which feeds a ship loader through a tripper, and the loader has a system of belts to carry the cement (or other bulk solids) up to a loading boom which has a chute and discharge pipe at its tip, then the material is taken through this chute and discharged into the ship's hold.
De modo que por fin me presento frente al juezParaCrawl Corpus ParaCrawl Corpus