In the case of excavation voids, including underground voids and back-filled surface mine voids, which are allowed to flood after closure, the operator shall take the necessary measures to prevent water status deterioration and soil pollution, and shall provide the competent authority with information on the following at least six months before the cessation of dewatering of the voids
Se on niille kuin vaahtokarkkiaoj4 oj4