the refurbishment of buildings, e.g. alterations to partitioning, alterations to technical installations and other specialist work on locks, electrical equipment, plumbing, painting, floor coverings, etc., and the cost of changes to the cabling associated with fixtures, and the cost of the necessary equipment (before contracts for an amount in excess of EUR # are renewed or concluded, and with a view to rationalising expenditure, the Office must consult the other institutions with regard to the conditions (price, currency chosen, indexing, duration, other clauses) obtained by each of them for a similar contract
El abuelo me lo ha contadooj4 oj4