The earned value field that shows how much of the budget should have been spent, in view of the baseline cost of the task, assignment, or resource. BCWS is calculated as the cumulative timephased baseline costs up to the status date or today's date.

Vertalings in die woordeboek Engels - Hongaars

ütemezett munka tervezett költsége

en
The earned value field that shows how much of the budget should have been spent, in view of the baseline cost of the task, assignment, or resource. BCWS is calculated as the cumulative timephased baseline costs up to the status date or today's date.
MicrosoftLanguagePortal

Geskatte vertalings

Vertoon algoritmies gegenereerde vertalings

voorbeelde

wedstryd
woorde
Advanced filtering
Voorbeelde moet herlaai word.
schedule performance index based on comparing budgeted cost of work performed with budgeted cost of work scheduled.
A nyilatkozat a következőket tartalmazzaEurLex-2 EurLex-2
schedule performance index per major item of the programme based on comparing budgeted cost of work performed with budgeted cost of work scheduled;
Te akkor még kiskölyök voltálEurLex-2 EurLex-2
The budgeted cost of work scheduled is $500.
Mindazonáltal azonos vámtarifaszám alá tartozó anyagok is felhasználhatók, ha értékük nem haladja meg a termék gyártelepi árának # %-átParaCrawl Corpus ParaCrawl Corpus
The budgeted cost of work scheduled is $500.
Ez már elég megdönthetetlen neked?ParaCrawl Corpus ParaCrawl Corpus
The BCWS (budgeted cost of work scheduled) field contains the cumulative timephased baseline costs up to the status date or today's date.
Csatolási időParaCrawl Corpus ParaCrawl Corpus
Schedule variance percent (SV%) is the EV schedule variance as a percentage of the budgeted cost of work scheduled: [(BCWP – BCWS) / BCWS] X 100.
Ha Kadaj ellen indulunk, szükségünk van egy tapasztalt emberreParaCrawl Corpus ParaCrawl Corpus
You can also compare BCWP to the BCWS (budgeted cost of work scheduled) field to determine whether the assignment is on track in terms of the schedule.
Tudod Anya, mennem kellene, mert a nővér értem jött, hogy mennem kellParaCrawl Corpus ParaCrawl Corpus
SPI (task field) The SPI (schedule performance index) field shows the ratio of the budgeted cost of work performed to the budgeted cost of work scheduled (BCWP/BCWS).
és #. intézkedésParaCrawl Corpus ParaCrawl Corpus
SPI (task-timephased field) The SPI (schedule performance index) field shows the ratio of the budgeted cost of work performed to the budgeted cost of work scheduled (BCWP/BCWS).
Nem használ nekemParaCrawl Corpus ParaCrawl Corpus
You can also compare BCWP to the BCWS (budgeted cost of work scheduled) field to determine whether the assignment is on track in terms of the schedule. The SV field shows the difference between these fields.
Ez aztán a kommunikáció!ParaCrawl Corpus ParaCrawl Corpus
Budgeted cost of work scheduled (BCWS) is the baseline cost through the status date for tasks scheduled in your project plan: how much you planned to spend by the status date, whether or not it's complete.
minden egyéb esetbenParaCrawl Corpus ParaCrawl Corpus
Earned Value Over Time Report Excel Use this report to view a chart that plots AC (actual cost of work performed), planned value (budgeted cost of work scheduled), and earned value (budgeted cost of work performed) over time.
A nappali menetfény automata bekapcsolóját szerszám használata nélkül is működésbe lehet hozni és üzemen kívül lehet helyezniParaCrawl Corpus ParaCrawl Corpus
To keep the cost of the work packages within budget will be a challenge, as will be industry’s ability to implement the work on schedule.
És pont ott álltunk; nem volt másik csapóajtóEurLex-2 EurLex-2
Example The schedule variance for a task (the difference between budgeted cost of work performed and scheduled) is $50.
Ugyanebből az okból kifolyólag a húzózár használatát sem akadályozza, annak ellenére, hogy a húzózárak rendszerint textilt is tartalmaznakParaCrawl Corpus ParaCrawl Corpus
Example On Monday, the schedule variance for a task (the difference between budgeted cost of work performed and scheduled) is $50, indicating you're $50 under budget.
A jóváhagyó hatóság előírhatja, hogy a gyártónak dokumentációcsomagot kell átadniaParaCrawl Corpus ParaCrawl Corpus
Remarks You can compare the BCWP to the ACWP (actual cost of work performed) field to determine whether the resource is on track in terms of budget. The CV field shows the difference between these fields. You can also compare BCWP to the BCWS (budgeted cost of work scheduled) field to determine whether the assignment is on track in terms of the schedule.
Az Európai Parlament #. december #-i véleménye (a Hivatalos Lapban még nem tették közzé), valamint a Tanács #. március #-i határozataParaCrawl Corpus ParaCrawl Corpus
Remarks You can compare the BCWP to the ACWP (actual cost of work performed) field, to determine whether the assignment is on track in terms of budget. The CV field shows the difference between these fields. You can also compare BCWP to the BCWS (budgeted cost of work scheduled) field to determine whether the assignment is on track in terms of the schedule.
Gyerünk Mouth!ParaCrawl Corpus ParaCrawl Corpus
After receiving the # draft work schedule and budget estimate the Commission may, on the basis of the latter and in order to facilitate the setting-up of the agency, advance to the Member States the amount representing the cost of setting up the agency
volt teled találkozni, fiameurlex eurlex
After receiving the # draft work schedule and budget estimate the Commission may, on the basis of the latter and in order to facilitate the setting up of the agency, advance to the Member States the amount representing the cost of setting up the agency
Mivel e területen országról országra eltérő kifejezéseket és meghatározásokat használnak, és szeretnénk elkerülni a fordításból eredő félreértéseket, fontos, hogy mindig a jelen szójegyzéket alkalmazzukeurlex eurlex
3. After receiving the 1984/85 draft work schedule and budget estimate the Commission may, on the basis of the latter and in order to facilitate the setting up of the agency, advance to the Member States the amount representing the cost of setting up the agency.
A gyerek előtt?Mickey, kérlekEurLex-2 EurLex-2
In the archifm.net software system cleaning can be and must be scheduled as a part of the maintenance plan, and it appears not only in the work plan but also in the budget plan, clearly as a part of all operation costs.
Csak egy pár perc, oké?ParaCrawl Corpus ParaCrawl Corpus
23 sinne gevind in 18 ms. Hulle kom uit baie bronne en word nie nagegaan nie.