Of this unencumbered balance, $450,000 will be utilized to meet the 2011 cost overruns for consultants and contractual services, with the remainder, $5,095,700 to be carried forward to 2012 for cameras and other related furniture, fixtures and equipment, the transition from existing to new studios and additional functionality not identified in the original design/build scope (e.g. additional digital Ethernet thin-wire station adapters in the General Assembly Building, integration of the permanent broadcast facility and media asset management system with all the other technologies being delivered, requirements for media operations and unforeseen change orders during the process of designing, building and implementing these complex technologies).
你 應該 嘗試 的 細胞 。- 未 找到 。UN-2 UN-2