After the conclusion of the second contract, comprising the agreed work programme, between the responsible TAB and the manufacturer, the responsible TAB shall send Part # of the work programme, together with the part of the technical file related to the description of the product and its intended use, to all the other TABs designated for the same construction products area, referred to in Table # of Annex V. Those TABs shall constitute a working group, which shall be co-ordinated by the responsible TAB
el régimen regulador de dicho tercer país impide la interferencia de las autoridades de supervisión y de otras autoridades públicas de dicho tercer país con el contenido de los métodos y las calificaciones crediticiasoj4 oj4