This section includes an approximately 30-mile segment between Hwy 9 and I-10, which would enable potential access to the rich renewable resource areas of southern New Mexico, and a 5-mile loop between the existing Afton Substation and the existing Luna-Diablo 345-kV transmission line (a technical requirement of the project which serves to strengthen the existing system). The Upgrade Section would consist of double-circuit 230-kV lines connecting the Apache Substation to the existing Saguaro Substation northwest of Tucson, Arizona. The Upgrade Section would rebuild approximately 120 miles of existing single-circuit 115-kV transmission lines, currently owned by the Western Area Power Administration (Western), providing up to 1,000 MW of transmission capacity between these substations.